Posted by: 3D-Archive | 21/02/2009 11:17 Comment this (0)
Proposal for Harbor Garage site
It’s not the best economic climate for building office space. But Don Chiofaro, a Boston-based developer seems unfazed. He is moving fast and furious to get approvals for a 1.5 million sq ft mixed -use project for Boston’s waterfront, betting the market will change by the time the project goes into construction.
In January he proposed a two-tower scheme for the site, a prime location between the New England Aquarium and the City’s new Greenway. But when that scheme was met with little enthusiasm, Chiofaro unveiled yet another design last week, a three-tower scheme designed by New... >>>
Posted by: 3D-Archive | 21/02/2009 11:15 Comment this (0)