ArchiBLOG - Architecture, 3d design, models and renderings
Olympic stadium will be recycled
The construction of the £496m London 2012 Olympic Stadium has officially started three months ahead of schedule and HOK Sports, the minds behind its design, have come up with a concept that could set a trend for Olympic venues to come.
The London 2012 Stadium will consist of a 25,000 seat concrete bowl adorned with an additional 55,000 seats placed in a temporary structure; details and methods of assembly and compatibility of materials are yet to be announced. >>>